The UNCVRD OS

    The operating system for product creation.

    Real-time visibility. Not status emails.

    Purpose-built for the full lifecycle. Every style, every milestone, every decision. Tracked in one place.

    Design finalizedTech pack sentProto 1 receivedFit review doneIn productionQC inspection

    Structure built in

    The moment a style is created, the full production roadmap exists. Nothing left to memory.

    Tech pack approvedSample sentQC passedIn production

    Visibility without status meetings

    Brand partners see exactly where their collection stands. No chasing. No summarizing.

    Shell fabricTrimsBOMColorwaysSupplierTech packPLM

    PLM built into the workflow

    Materials, trims, tech packs, and BOMs live inside the same system as the milestones. No switching tools. No version confusion.

    DASHBOARD

    Know where everything stands.

    A live view across every program and every active style. Recent activity, upcoming milestones, pending approvals. Hourly updates. The full picture without a single status meeting.

    Tuesday, March 26

    Good morning, Sarah

    Here's what's happening with Aura Athletics.

    3

    Programs

    6

    Active styles

    3

    Pending approvals

    4

    Due this week

    3 approvals need your review

    Your feedback keeps production on schedule.

    Review now

    Recent activity

    Velocity Split Short — Proto 2 sample shipped from factory

    Tracking: FDX-8821349

    2 hours ago

    AeroKnit Singlet — Tech pack v3 uploaded

    5 hours ago

    Eclipse Tight — Phase moved to Sampling

    1 day ago

    Trail Shell Jacket — BOM finalized — 12 lines confirmed

    1 day ago

    Ridgeline Half-Zip — Factory assigned: Viet Garment Co.

    2 days ago

    Coming up

    Proto 2 fit review

    Velocity Split Short

    Mar 28

    Lab dip submission

    AeroKnit Singlet

    Mar 29

    Strike-off round 1

    Trail Shell Jacket

    Mar 30

    Needs your review

    Proto 2 sign-off

    Velocity Split Short

    Lab dip approval

    AeroKnit Singlet

    STYLES

    Every style. Every program. Live.

    The full roster of what your brand is building, in one view. Every style enters the system with its own production roadmap. Click in and the entire history is there, brief, materials, samples, comments, approvals.

    Styles

    All your styles, organized by program.

    SS26 Performance

    3 styles

    Velocity Split Short

    AA-1001
    In samplingNext: Proto 2 fit review · Mar 28
    42%

    AeroKnit Singlet

    AA-1002
    Design & EngineeringNext: Lab dip submission · Mar 29
    28%

    Eclipse Tight

    AA-1003At risk
    In samplingNext: Proto 1 review · Mar 31
    38%

    SS26 Outerwear

    2 styles

    Trail Shell Jacket

    AA-2001
    Design & EngineeringNext: BOM finalization · Apr 2
    22%

    Ridgeline Half-Zip

    AA-2002
    IntakeNext: Factory assignment · Apr 5
    8%

    FW26 Essentials

    1 style

    Pace Merino Tee

    AA-3001
    Design & EngineeringNext: Tech pack v2 · Apr 8
    25%

    MILESTONE TRACKING

    Every milestone tracked. Nothing falls through.

    120+ milestones auto-created the moment a style is added. Phase by phase, from brief to shipment. Every update logged, timestamped, and attributed.

    Aura Athletics/SS26/AA-1001

    AA-1001 — Velocity Split Short

    Milestone tracker · 9 of 23 complete

    120+ milestones tracked per collection

    Design Finalization

    3/3

    Design brief approved

    Zara T.9 Jan

    Flat sketch finalized

    Liam K.17 Jan

    Colorways confirmed

    Zara T.22 Jan

    Tech Pack

    4/4

    Tech pack drafted

    Priya M.4 Feb

    BOM finalized

    Priya M.12 Feb

    Spec sheet approved

    Will W.19 Feb

    Sent to factory

    Priya M.20 Feb

    Sampling

    1/5

    Proto 1 received

    Daniel R.7 Mar

    Proto 1 fit review

    Zara T.12 Mar

    Proto 2 cut

    Daniel R.28 Mar

    Proto 2 fit review

    Zara T.5 Apr

    Size set grading

    Priya M.12 Apr

    Production

    0/2

    Bulk fabric ordered

    Daniel R.22 Apr

    Trim sourcing complete

    Daniel R.28 Apr

    TECH PACKS & BOMS

    Tech packs, BOMs, and approvals. All live.

    No more emailed PDFs. Every tech pack lives in the OS, versioned, tracked, and always current. BOMs, construction details, and approval flows in one place.

    Trail Shell Jacket

    AA-2001Design & Engineering

    SS26 Performance · Tech Pack v3

    v3 — Mar 22, 2026
    BOM
    Spec sheet
    Colorways
    Sketches
    Tech pack v3Pending reviewWill W.
    BOM v2Pending reviewPriya M.
    Spec sheet v1Pending reviewZara T.
    DescriptionMaterialColorwayPlacementSupplierUnitQty
    Body — MainUltralight Ripstop (ULR-220)Black / ObsidianBody panelsToray JapanYD1.8
    Body — ContrastUltralight Ripstop (ULR-220)Fog GreySide panelsToray JapanYD0.6
    Body LiningCupro Bemberg (CB-110)CharcoalFull body liningAsahi KaseiYD1.6
    Main zipYKK Vislon #5BlackCFYKK VietnamPC1
    Pocket zipYKK Aquaguard #3BlackChest pocketYKK VietnamPC2
    Woven labelSatin Damask (WL-40)Black/WhiteBack neckHang SangPC1

    BRAND PORTAL

    Your collection. Live.

    Everything above, scoped to your program. The real-time view the team works from. Not a summary. Not a report. The actual data.

    UNCVRDAura Athletics
    View only
    SS26
    AA

    Welcome back, Aura Athletics

    SS26 collection overview · Last updated 2 hours ago

    67%complete

    9 of 14 styles on track

    2 styles in production · 4 sampling · 3 in development

    Style progress

    Velocity Split Short

    AA-1001

    Sampling

    Proto 2 dispatched · 26 Mar

    Next: Fit review · 28 Mar

    AeroKnit Singlet

    AA-1002

    In Development

    Tech pack v3 uploaded · 24 Mar

    Next: Lab dip · 29 Mar

    Eclipse Tight

    AA-1003

    Sampling

    Phase moved to Sampling · 22 Mar

    Next: Proto 1 review · 31 Mar

    Trail Shell Jacket

    AA-2001

    In Development

    BOM finalized · 20 Mar

    Next: BOM finalization · 2 Apr

    Ridgeline Half-Zip

    AA-2002

    In Development

    Factory assigned · 18 Mar

    Next: Tech pack draft · 5 Apr

    Key dates

    Final samples due

    14 Apr

    Production start

    2 May

    QC window opens

    1 Jun

    Ex-factory ship

    15 Jun

    Built for the way product gets made.

    The OS is exclusive to UNCVRD brand partners. Apply to see it in action.

    Start your next line with UNCVRD